Calculate posts, rails, pickets, and materials for your fencing project
Standard: 6-8 feet
Mark post locations, dig holes 2-3 ft deep and 3× post width.
Place posts, add gravel base, level, and pour concrete.
Install rails between posts after concrete cures (24-48 hrs).
Attach pickets or boards to rails, maintaining consistent spacing.