Calculate concrete volume, cement, sand, aggregate, and reinforcement needed for staircase construction with accurate measurements.
Standard: 900-1200mm
Standard: 250-300mm
Standard: 150-200mm
Step Volume: (Tread × Riser × Width × Steps) / 2
Waist Slab: Waist Length × Width × Thickness
Landing: Length × Width × Thickness
Waist Length: √(Total Rise² + Total Run²)
| Grade | Mix Ratio | Strength (MPa) | Application |
|---|---|---|---|
| M15 | 1:2:4 | 15 MPa | Light residential |
| M20 | 1:1.5:3 | 20 MPa | Standard residential |
| M25 | 1:1:2 | 25 MPa | Heavy duty/commercial |
Use 10mm or 12mm bars in both directions. Main bars at bottom (tensile zone), distribution bars on top. Maintain 25mm clear cover.
Use 19mm plywood or metal sheets. Support every 600-900mm with props. Formwork must be rigid to prevent deflection during pouring.
Pour in single operation if possible. Use vibrator to remove air pockets. Start from bottom, work upward. Don't walk on fresh concrete.
Cure for minimum 14 days by water sprinkling 3-4 times daily. Keep formwork for 14-21 days. Longer curing = stronger stairs.
All risers must be same height (±3mm tolerance). Inconsistent steps cause accidents. Use templates to ensure uniformity.
Provide landing after every 12-15 steps for safety. Landing width should equal staircase width. Helps in turning and resting.
For a standard 13-step staircase (175mm riser, 250mm tread, 1000mm width, 150mm waist), you need approximately 1.5-2.0 m³ of concrete. This requires about 45-60 cement bags, 1.0-1.3 m³ sand, and 2.0-2.6 m³ aggregate for M20 grade.
Ideal staircase angle is 30-35 degrees for residential buildings. Angles between 25-40 degrees are acceptable. Steeper than 40° becomes uncomfortable and unsafe, while less than 25° wastes space.
Typically 80-100 kg of steel per m³ of concrete for staircases. For 2 m³ staircase, you need 160-200 kg steel. Use 10mm or 12mm bars spaced 150-200mm apart both ways, with proper hooks and overlaps.
Keep formwork (shuttering) for minimum 14 days, preferably 21 days. Props should remain for 14 days minimum. Remove side formwork after 7 days, but keep bottom support longer. Never remove formwork prematurely.
Inconsistent risers are dangerous and violate building codes. All risers must be within ±3mm tolerance. Use precise formwork and templates. If building codes violation, you may need to break and reconstruct.
M15 is acceptable only for light residential use with short spans (less than 3m). M20 is recommended for standard residential. Use M25 for commercial buildings, long spans, or heavy traffic areas.
Rule of thumb: waist thickness = effective span / 20 to span / 25. For 3m span, use 120-150mm. Minimum 125mm for residential, 150-200mm for commercial. Consult structural engineer for spans over 4m.
Explore more calculators to solve your calculation needs

Calculate paint needed for walls

Calculate tiles needed for flooring

Calculate concrete volume needed

Calculate drywall sheets needed

Calculate flooring materials needed

Calculate gravel quantity needed